---
product_id: 64976966
title: "Volans 2 meter long lead UK plugUltimate 7.5V UK Mains AC Charger Adapter for Vtech Innotab 3 Plus Tablet"
brand: "volans"
price: "264 kr"
currency: NOK
in_stock: true
category: "Electronics"
url: https://www.desertcart.no/products/64976966-volans-2-meter-long-lead-uk-plugultimate-7-5v-uk
store_origin: NO
region: Norway
---

# Volans 2 meter long lead UK plugUltimate 7.5V UK Mains AC Charger Adapter for Vtech Innotab 3 Plus Tablet

**Brand:** volans
**Price:** 264 kr
**Availability:** ✅ In Stock

## Quick Answers

- **What is this?** Volans 2 meter long lead UK plugUltimate 7.5V UK Mains AC Charger Adapter for Vtech Innotab 3 Plus Tablet by volans
- **How much does it cost?** 264 kr with free shipping
- **Is it available?** Yes, in stock and ready to ship
- **Where can I buy it?** [www.desertcart.no](https://www.desertcart.no/products/64976966-volans-2-meter-long-lead-uk-plugultimate-7-5v-uk)

## Best For

- volans enthusiasts

## Why This Product

- Trusted volans brand quality
- Free international shipping included
- Worldwide delivery with tracking
- 15-day hassle-free returns

## Description

• • Home power adaptor for VTech electronic products • Don't run out of batteries while playing at home • Charge your InnoTab, MobiGo, or Storio • Also compatible with the V.Smile Motion console • Simply plug into your mains adaptor for ongoing power Product Description Power up with the VTech Power Adaptor! Compatible with all VTech products featuring an adaptor socket, including the InnoTab, MobiGo, Storio, and V.Smile Motion. Manufacturer's Description Power up with the VTech Power Adaptor. Compatible with all VTech products featuring an adaptor socket (not compatible with the InnoTab Baby learning tablet).

## Features

- •	• Home power adaptor for VTech electronic products • Don't run out of batteries while playing at home • Charge your InnoTab, MobiGo, or Storio • Also compatible with the V.Smile Motion console • Simply plug into your mains adaptor for ongoing power Product Description Power up with the VTech Power Adaptor! Compatible with all VTech products featuring an adaptor socket, including the InnoTab, MobiGo, Storio, and V.Smile Motion. Manufacturer's Description Power up with the VTech Power Adaptor. Compatible with all VTech products featuring an adaptor socket (not compatible with the InnoTab Baby learning tablet).

## Images

![Volans 2 meter long lead UK plugUltimate 7.5V UK Mains AC Charger Adapter for Vtech Innotab 3 Plus Tablet - Image 1](https://images-eu.ssl-images-amazon.com/images/I/51vUh24-K9L.jpg)
![Volans 2 meter long lead UK plugUltimate 7.5V UK Mains AC Charger Adapter for Vtech Innotab 3 Plus Tablet - Image 2](https://images-eu.ssl-images-amazon.com/images/I/41LtWFiw0mL.jpg)

---

## Why Shop on Desertcart?

- 🛒 **Trusted by 1.3+ Million Shoppers** — Serving international shoppers since 2016
- 🌍 **Shop Globally** — Access 737+ million products across 21 categories
- 💰 **No Hidden Fees** — All customs, duties, and taxes included in the price
- 🔄 **15-Day Free Returns** — Hassle-free returns (30 days for PRO members)
- 🔒 **Secure Payments** — Trusted payment options with buyer protection
- ⭐ **TrustPilot Rated 4.5/5** — Based on 8,000+ happy customer reviews

**Shop now:** [https://www.desertcart.no/products/64976966-volans-2-meter-long-lead-uk-plugultimate-7-5v-uk](https://www.desertcart.no/products/64976966-volans-2-meter-long-lead-uk-plugultimate-7-5v-uk)

---

*Product available on Desertcart Norway*
*Store origin: NO*
*Last updated: 2026-10-17*